@muhammad_idriss31:

𝙍𝙪𝙖𝙣𝙜𝙝𝙖𝙩𝙞🥀
𝙍𝙪𝙖𝙣𝙜𝙝𝙖𝙩𝙞🥀
Open In TikTok:
Region: ID
Tuesday 25 November 2025 06:42:28 GMT
243084
28120
348
4987

Music

Download

Comments

naa_0257
naa♡ :
malam salting pagi asing
2025-11-25 08:53:39
408
roselynth_
itsmetta :
Bru jg 3 bulan eh udh asing aja
2025-11-25 08:07:51
94
inna.risnaa
IG: inna_rsnaa♓️ :
ada tunangannya😭
2025-11-26 11:59:01
0
lindazasmita
lindazasmita :
dah 8 bulan tapi capek juga 😅 mending asing aja ngak sih
2025-11-25 10:53:21
28
_nveliza
-n :
baru 3 hari😭
2025-11-26 01:46:39
0
_vietha92
_vietha92 :
kalau udah terlanjur gimana🤣🤣😭
2025-11-25 13:43:20
9
this_lia22
aulia :
GABISAA MAKIN KECINTAAN!!! 😭😭
2025-11-26 10:02:05
2
mmoktvia
🐣 Memeee 🎐 :
mv on nya ga ngotakn😭
2025-11-26 08:58:38
1
aquase2024
;) :
SETUJUUUUUUUU
2025-11-26 11:50:32
0
yanniiu10
yanii :
sebulanan tapii susahnya lupain
2025-11-26 10:29:03
0
aputt_29
Aputt :
htsan ga nyampe sebulan lupainnya berbulan bulan🥺🥺
2025-11-26 10:11:52
2
_asna025
asna :
jangann ditinggal lebih tepatnya 😜
2025-11-25 12:48:26
10
__n329
naurazalfaa :
7 bulan tapi akhirnya...😇
2025-11-26 02:54:55
0
weneverno
Penghuni Gemin!♊ :
kemarin salting,sekarang asing😭
2025-11-25 16:39:47
0
zaskiaam00
Xyzaa_ :
mau marah tapi malu gk ada status😭
2025-11-26 01:20:18
0
eun_olla
Angel :
Stopp wkwk
2025-11-26 03:52:08
0
yuliani3962
Yuliii🍜🦋 :
Jangan yah deck jangan lupain nya susah wkwk
2025-11-25 08:20:11
5
nda17161112
WINDA🫧🧸 :
Gue mah aman” aja🤭🤪
2025-11-25 14:42:06
1
niarustam_
Gania :
Iyaa ihh nyesell 😭😭 mw udahin tpi gabisa 😭
2025-11-26 10:16:28
0
rfsyfzh
matchaa :
sebaik baiknya hts, gapapa drpd gada sama sekali WKWK
2025-11-25 11:24:40
8
fasyaseptia
Dokca :
tulss
2025-11-26 06:02:46
0
luvv.vanillalatte
🌞 :
hts + blm selesai sama masa lalu🤣
2025-11-26 06:30:52
1
pikar21.10
SayaZull🤔 :
hts(harus tekun solat)
2025-11-25 10:20:00
5
another.xxo
191 :
telat kak udah 3th hts-an😭🙏🏻
2025-11-26 11:11:41
0
fitriiii685
mumunnn🐢 :
sebaik-baik nya beda agama sebaiknya jangan 😭🙏
2025-11-26 00:28:09
2
To see more videos from user @muhammad_idriss31, please go to the Tikwm homepage.

Other Videos

The Tiwi Geothermal Power Plant in Albay is the first and oldest geothermal power plant in the Philippines, with an operational history dating back to the 1970s. Operated by AboitizPower's subsidiary AP Renewables Inc., the plant has a current installed capacity of 234 MW, with four generating units. It uses geothermal steam from the earth to produce clean electricity for the Luzon grid, contributing significantly to the country's renewable energy supply.   Key details about the Tiwi Geothermal Power Plant History:  The first large-scale geothermal plant in the Philippines was inaugurated in Tiwi, Albay in 1979. Its roots go back to 1967, when an experimental lab first powered a light bulb using geothermal steam from Mount Malinao.  Capacity:  The plant has a current installed capacity of 234 MW and has four generating units. In the past, it had a capacity of 330 MW with six units.  Operations:  The plant produces clean energy by using steam from the earth's heat to turn turbines that are connected to generators. The electricity is then sent to homes, offices, and industries through power lines.  Recent developments:  A new 17-MW binary geothermal plant was under construction and expected to be operational by the end of 2023. This plant will source power from the residual heat of the hot brine, an additional step in harnessing the geothermal resources.  Mayon Volcano impact:  Operations have remained normal despite increased activity from the nearby Mayon Volcano, with no significant changes observed in the geothermal field's temperature or fluid flow.  Operator:  AP Renewables Inc. (APRI), a subsidiary of Aboitiz Power, operates the plant.  Areas within the field:  The Tiwi Geothermal Field is divided into four geographical areas: Naglagbong, Kapipihan, Matalibong, and Bariis. 
The Tiwi Geothermal Power Plant in Albay is the first and oldest geothermal power plant in the Philippines, with an operational history dating back to the 1970s. Operated by AboitizPower's subsidiary AP Renewables Inc., the plant has a current installed capacity of 234 MW, with four generating units. It uses geothermal steam from the earth to produce clean electricity for the Luzon grid, contributing significantly to the country's renewable energy supply.   Key details about the Tiwi Geothermal Power Plant History:  The first large-scale geothermal plant in the Philippines was inaugurated in Tiwi, Albay in 1979. Its roots go back to 1967, when an experimental lab first powered a light bulb using geothermal steam from Mount Malinao.  Capacity:  The plant has a current installed capacity of 234 MW and has four generating units. In the past, it had a capacity of 330 MW with six units.  Operations:  The plant produces clean energy by using steam from the earth's heat to turn turbines that are connected to generators. The electricity is then sent to homes, offices, and industries through power lines.  Recent developments:  A new 17-MW binary geothermal plant was under construction and expected to be operational by the end of 2023. This plant will source power from the residual heat of the hot brine, an additional step in harnessing the geothermal resources.  Mayon Volcano impact:  Operations have remained normal despite increased activity from the nearby Mayon Volcano, with no significant changes observed in the geothermal field's temperature or fluid flow.  Operator:  AP Renewables Inc. (APRI), a subsidiary of Aboitiz Power, operates the plant.  Areas within the field:  The Tiwi Geothermal Field is divided into four geographical areas: Naglagbong, Kapipihan, Matalibong, and Bariis. 

About